目 录
1 工程概况····································································1
2 材料组成····································································1
3 施工要求及条件····························································1
4 施工工具····································································2
5 工艺流程····································································2
5.1 基层清理································································2
5.2 配制砂浆································································3
5.3 刷专用界面剂一道·····················································3
5.4 预粘板端翻包网格布··················································3
5.5 粘贴挤塑板·····························································3
5.6 安装固定件·····························································6
5.7 打底·····································································8
5.8 滴水槽···································································8
5.9 设置伸缩缝·····························································9
5.10 涂刷专用界面剂······················································9
5.11 抹第一遍面层聚合物抗裂砂浆······································9
5.12 埋贴网格布···························································9
5.13 抹面层聚合物抗裂砂浆·············································11
6 细部及特殊部位做法·····················································14
7 安全措施··································································16
8 文明施工及成品保护·····················································17
9 成本降低措施·····························································17
10 环境保护措施···························································18